Blog · 6 min read

Why Contractors Retype the Same Details Forty Times a Year

· PDFeyes Blog

Ask a plumbing contractor what they spend Friday afternoons doing and a fair number will say paperwork. Not estimating, not scheduling. Filling in the same boxes on the same forms with the same answers they gave last week.

One job 16502 Lakeview Dr Building permit18 fields Plumbing permit15 fields Electrical permit9 fields Mechanical permitplus registration, annually same company every time
One residential job, four applications. The company block is identical on all of them, and the job block repeats on each.

The forms are not badly designed. They are separately designed.

A city's plumbing permit is a good form. So is the electrical permit. The problem is that they were designed independently, by different departments, to be filed one at a time on paper. An assumption that made complete sense when they were.

Nothing in that model knows you filed the building permit for the same address an hour ago. Each form asks from scratch because each form was designed to stand alone.

Where the cost lands

It is not the typing. Twenty fields is a few minutes. The cost is in three less obvious places:

Why the obvious fix has not happened

Cities are not going to unify permit forms across jurisdictions; there is no body that could make them, and no city gains anything by matching another's field names. Software that holds your details usually wants an account, which means a server holding several hundred contractors' license numbers and their clients' addresses. A target, and a reason for caution that is entirely rational.

The version that avoids both problems

Hold the details on the contractor's own machine, and match them to whichever form is opened. No unified standard needed, because the matching handles the naming differences. No server needed, because nothing is stored centrally. Nothing to breach, because there is no database.

"Contractor Name", "Company Name" and "Name of Firm" are the same question. A tool that knows that can fill any city's form without anyone agreeing on anything.

Which city you file in changes the registration and the insurance limits rather than the fields themselves. We have written down what specific cities ask for, starting with Jersey Village, Texas.

What it will not fix

Insurance certificates still have to come from your agent. Trade permits still need the master permit number, which only exists once the building permit is issued. Right-of-way work still needs plans and a bond. The paperwork around the application is not going anywhere.

But the part where you type your own company name for the fortieth time this year, that part was never necessary.

Enter it once. Every permit you open fills itself. Nothing is uploaded and nothing survives the tab closing.

Try it